This is the print preview of the page.

How to install PE pressure systems

Group 2: Burried systems

Pipe installtations belonging to group 2 are exemplified by the parts of a communal water supply network. They are, however, also frequently used in the area of industrial waste water technology. Due to the flexibility of PE pipes, the costs of groundwork are lower than they are when laying steel, ductile iron or concrete pipes. PE also has distinctive advantages over less flexible plastic pipes (such as PVC).


You can download the corresponding chapters from our Specification Manual at the right.

 

Burried systems

 

Back to page 'How to install PE pressure systems'