How to install PE pressure systems
Group 1: Above ground systems
Group 1 consists of pipe systems with linear compensation and without linear compensation. These systems require a bracket construction and are predominantly found in chemical or sewage plants, as well as in swimming pool construction. They generally require the largest project outlays. Planning aids and discernible influential factors for these pipe systems:
Above ground systems with linear compensation
Above ground systems without linear compensation



